" APC is commited to excellence in their continuous development program, always seeking out new production methods and technologies that help will provide the very best"
Early 2007 saw APC move their office and production facility to Monarto in South Australia to provide room for greater expansion and the ability to progress into more diversified areas of service and engineering, together with a more centralised service distribution point to service all areas of the Australian continent.

APC continues to develop it's facilities to provide a complete service where everything is taken care of as a comprehensive service package.
      
Australian Portable Camps
Accommodation and Camp Specialists
APC is commited to excellence in their continuous development program, always seeking out new production methods and technologies that help will provide the very best and latest in camp and support solutions.
Monarto Developments
Manufacturing plant is being installed in sheds 3 & 4 and preparations are being made for the erection of sheds 5 & 6.

Click Here to read more about the current development at Monarto.
Latest Developments
A Commitment to Excellence
Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments
Multi-Storey Accommodation
Shed 6 being erected
Kitchen Re-furbishing
Roll-form plant and Coil Slitter plant ready for commissioning
The first Assembly Line plant being installed
APC Monarto
APC Monarto Office and Carpark
New plant being installed
Monarto Developments Monarto Developments Monarto Developments
Shed 5 being erected
An "All in One" Solution
Current production facilities at APC's Monarto production site include:

Camp building production
Panel manufacture
Automatic Roll-forming
Generators
Engineering
Mechanical
Electrical
Waste water treatment
Potable water plant.

For more details on APC's production and manufacturing facilities visit our Facilities and Manufacturing pages
Current Developments

Sheds 5 & 6
Erection has started on the steel structure of shed 5 which will house the Rock Wool continuous sandwich panel plant and the PIR continuous sandwich panel plant as well as the slightly smaller shed 6.

The production assembly line shed (No. 3) is being prepared to have plant installed. The first machines to be installed are the floor panel press. The assembly line will enable APC to manufacture buildings at 24-30 rooms per day. Kitchens and wet-mess will be able to be produced 2-3 weeks from the date of order.

Storage facilities are installed in shed 4 enabling the efficient storage and retrieval of parts and equipment. The rear section of this shed will be used for the maintenance of trucks and vehicles and work is currently under way on the lareg heavy equipment service pit.

The Coil Slitter plant has been installed in shed 2 along with a number of other profile roll-forming machines for manufacturing 'C' channel and profiled colorbond roof sheeting.

APC - Since 1988
Retail Sales
A new retail area is being developed where retail items and services will be available over the counter. As this area develops, our Retail web page will provide all the information about the retail items available.
Multi-Storey
Development continues with Multi-storey accommodation buildings.
All new APC camp buildings will feature the latest design for stackable multi-storey erection.  The ability to use any of our new buildings as multi-storey camps is a standard option that is provided at no extra unit production cost.

Production of multi-storey accommodation buildings require newly engineered and patented design base frames and corner/side supports.  Manufacture of the wall and ceiling panels is being automated so that these panels are produced by a patented system as a fully integrated single unit including all insulation, wiring and other services.

The capacity for APC to provide roll forming increases our production rate and quality control as well as an increase in building strength and R value to meet cyclonic conditions (W99) and Class 3 ABS conditions.

Manufacture of new accommodation and service buildings as well refurbishment of buildings returned from completed projects or buildings needing an upgrade.  APC's constant development program ensures that each building is manufactured with the latest techniques and facilities.

Manufacturing Services
Installation of new plant for our manufacturing section continues.

New Electrical Generators for APC Camps
APC has taken delivery of new generators that are available for camps.
Monarto Developments Monarto Developments Monarto Developments Monarto Developments Monarto Developments
New guilotines and manufacturing plant being installed and one of the new electrical generators
Heavy Machinery Service Pit being dug
New Fork-lifts and Storage facilities