"Australian
Portable Camps is the sole Australian provider of innovative camp solutions
aimed to meet specific project needs and individual site environmental
requirements"
In January 2007 APC commissioned construction of an accommodation and pipe
laying barge in Singapore.
The barge is designed to operate in relatively shallow inshore environments and can accommodate up to 292 persons in ensuited accommodation.
It has been built with the Australian market in mind and as a consequence it offers facilities far superior to similar barges currently in use.
The launch ceremony took place around midnight in late June 2008.
See below for Current News and Specifications of the Aussie 1 barge.
For further details and enquiries about the Aussie 1 offshore accommodation barge, please contact Australian Portable Camps via the details on our Contact us page.
The barge is designed to operate in relatively shallow inshore environments and can accommodate up to 292 persons in ensuited accommodation.
It has been built with the Australian market in mind and as a consequence it offers facilities far superior to similar barges currently in use.
The launch ceremony took place around midnight in late June 2008.
See below for Current News and Specifications of the Aussie 1 barge.
For further details and enquiries about the Aussie 1 offshore accommodation barge, please contact Australian Portable Camps via the details on our Contact us page.
Australian
Portable Camps
Accommodation and Camp Specialists
Accommodation and Camp Specialists
Offshore
Services
What's
happening now at our Monarto facilities? Click here
to see the latest developments.
Latest
Developments
Current
News


Aussie 1 preparing for service!
Through a unique method of using inflatable baloon rollers, the APC Aussie 1
accommodation barge was launched during a midnight ceremony and is being
prepared for commissioning and will then head off to the Southern Tasman waters
of Australia.
The barge is currently undergoing final fitments and preparations for service.
Barge
Specifications



CLASS
- ABS A1 (Unrestricted service)
- MODU code attestation
DIMENSIONS
- Length: 112m(341ft)
- Beam: 32m (98ft)
- Depth moulded: 9m (27ft)
- Draft: 4.8m (normal operating) 1.8m (min)
HULL TYPE
- Flat Bottom
PIPELAYING FACILITIES
Pipelay Equipment
- Pipelay capability for 8" to 48" pipe + concrete
- 90 ton pipe lay tensioner capacity (30m/min)
- 100 ton pipe lay abandonment / recovery wicnh
- Automatic tensioner transfer system
- Pipelay conveyor and transfer system rated to 32 ton
- 6 welding stations with semi-automatic welding system (STT & flux core)
- 1 NDT station
- 2 field joint stations
Stinger/Ramp
- 4 degree sloping production firing line
- 34m outrigger stinger adaptable to different project requirements
DECK AREA
- Large clear deck area (over 2000m2, 12.5t/m2 rating)
- Very high capacity: over 11,000 tonnes
LIFTING / CRANE CAPACITY
- High specification 280 ton crawler crane
DIVING CAPABILITY
- Large in-built mon-pool (5.5m x 5.5m)
- Support services for modular saturation diving spread
MOORING SYSTEM
- High capacity single drum mooring system
- 8 x 90 ton mooring winches (1500m/2" wire)
- 9 x 10 tonne Delta Flipper anchors
ACCOMMODATION
- High standard accommodation for up to 292 persons
- All 1 and 2 person cabins with en-suites
- Large galley with seating for 120
- Large cinema, TV room and recreational facilities
- Internet and email room
- Well equipped gym
- Large laundry and food storage facilities
HELIDECK
- Size: 22 x 22m for Sikorsky S76 and S61
MAIN ENGINES
- 5 x 1000kW generators @ 440V, 60hz
- Emergency generator rated to 500kW
SAFETY SYSTEMS
- Life rafts to 590 person capacity
- 600 life jackets/12 life rings
- 1 x fast recue boat
- Active high specification smoke and fire monitoring and extinguisher system in all accommodation, engine, winch, paint and boiler rooms
- Sprinkler system
- Machinery guarding systems
- Dedicated boat landing transfer points
ENVIRONMENTAL
- Sewage treatment system meeting MARPOL standards
- Spill prevention systems
- 2 x 40t/day water makers
Ready
to launch
Under
Construction
Midnight launch
Final
fitments after launch
Offshore
Accommodation



To view a video of the launch of Aussie 1
click here << aussie1_launch.wmv (7mb) >>
Below shows a panorama image of the barge under construction as of beginning of May 2008
click here << aussie1_launch.wmv (7mb) >>
Below shows a panorama image of the barge under construction as of beginning of May 2008
The
image below shows the barge lifted on inflatable launching baloons just prior
to midnight launching.
Fitting
of the 34m Outrigger Stinger and other on deck components.