"Each
of our buildings is the result of innovative design, research, engineering and
development, designed to keep up with the ever changing demands in the world
today"
At APC each of our buildings is the result of innovative design, research,
engineering and development, designed to keep up with the ever changing demands
in the world today and we have proudly set new standards for the following:
- Standards for camp accommodation and all related infrastructures.
- Our mobile camp system has been developed to meet the changing needs of mining, exploration and the construction industries where mobility and continuous shifting or camp relocations is required.
- APC's process of installation, demobilisation and relocation has been simplified by our unmatched system aimed at reducing spiralling costs and time.
- With APC's systems we can relocate the whole camp in a single day and we can guarantee the uninterrupted camp life operation.
- With improved efficiency and maximum material recovery APC has improved time management and have drastically reduced the usually high camp installation costs
Australian
Portable Camps
Accommodation and Camp Specialists
Accommodation and Camp Specialists
Standard accommodation comprises of blocks of:
- Self contained accommodation room (4 rooms per building)
- Share ensuite accommodation rooms (4 rooms per building)
-
Combination of 4 shared ensuite rooms plus 1 self contained ensuited room
(5 Rooms per building) - Bunk type of accommodation with fully integrated individual Self contained shower & hand basin Toilet Hand basin Washing machine Clothes dryer
Accommodation
As
a standard feature, all new accommodation buildings manufactured by APC
are enabled for multi-storey installation.
APC now manufactures to Class 3 BCA standard. Read more...
APC now manufactures to Class 3 BCA standard. Read more...
Did
You Know?
Standard
Accommodation

Multi-Storey
Accommodation
Standard
Accommodation
New
Class 3 BCA buildings
BCA
Class 3 Compliance
Staff
Accommodation

Staff accommodation comprises of blocks of many configurations
- Manager /Supervisor Unit Fully equipped kitchen, lounge, laundry, toilet and double bedroom
-
Foreman/Senior Personnel Unit Kitchenette, lounge,
toilet and single bed (2 rooms per unit)
Multi
Storey Accommodation

There are many large projects where space is a major problem. APC offer a new
attractively engineered multi-storey building system for camp accommodation.
This new system has been developed by APC after extensive market research and continuous field performance evaluation. This new multi-storey system is aimed at all new mining and construction projects, both onshore and off-shore.
Visit the Multi-Storey Accommodation page for more details.
This new system has been developed by APC after extensive market research and continuous field performance evaluation. This new multi-storey system is aimed at all new mining and construction projects, both onshore and off-shore.
Visit the Multi-Storey Accommodation page for more details.
New
Standards
Other Accommodation

Any other configuration can be provided to suit your requirements.
APC offer our clients the choice of many accommodation packages with different infrastructure combinations to suit all requirements for each project, location or budget.
APC offer our clients the choice of many accommodation packages with different infrastructure combinations to suit all requirements for each project, location or budget.
Shrink-wrapping of an accommodation building prior to transport to camp site
APC is now producing the first accommodation buildings to be Class 3 BCA
standards compliant. APC buildings are also manufactured to cyclonic
wind ratings.
This new accommodation building design is adopted throughout for both single and multi storey installations manufactured since August 2009.
New developments in design have, for example, created a new shower alcove of 1080 x 1080 internal dimensions for absolute space and comfort.
This new accommodation building design is adopted throughout for both single and multi storey installations manufactured since August 2009.
New developments in design have, for example, created a new shower alcove of 1080 x 1080 internal dimensions for absolute space and comfort.